Register or Login to Apply

Construction Programmer Wanted!

Rider Levett Bucknall Brisbane, Brisbane

Job Description

Would you like to work for one of the most highly regarded international construction cost, program and advisory consultancies in Brisbane?

Providing valued services to all industry sectors, on some of the most high-profile projects in Brisbane and Australia?

If you’re seeking a change in direction and looking for a new challenge in 2023, we would love to talk to you.

We are looking for:

We are looking for a construction programmer with a minimum 5 years post grad experience to join our specialist programming, delay claim analysis team based in our Brisbane office.

Reporting directly to the programming director, this role will provide you with a unique opportunity to receive valuable mentoring, gain diverse project experience, as well as expand and develop your knowledge base.

The role of the programmer is to manage all time related aspects of a construction project, commencing from feasibility and/or design, all the way through to practical completion.

If you are an enthusiastic, ambitious team player with an ability to think logically and strategically with excellent communication skills, then this could be the role you have been looking for.

Position requirements include:

  • Australian Citizen or Permanent resident
  • Degree or higher qualification in Construction Management is preferred
  • Experience using Primavera P6, Microsoft Project or Powerproject
  • Experience using Microsoft Office applications including Word and Excel
  • Previous Australian construction industry experience would be an advantage
  • Ability to communicate effectively (written and oral)
  • Ability to prioritise and multitask effectively
  • Ability to work well as part of a team
  • Full Australian driving licence
  • If you’re seeking a change in direction and looking for a new challenge in 2023, we would love to talk to you.

      This job vacancy was been posted over 40 days ago, but is still active and currently accepting new applications.

    By displaying these images, Backpacker Job Board does not claim any ownership or endorsement of the materials. Backpacker Job Board assumes no liability for copyright infringements, licensing disputes, or any other intellectual property claims arising from employer-submitted images. If you believe that any image displayed on Backpacker Job Board infringes your copyright or other legal rights, please contact us at [email protected]. We are committed to promptly reviewing all such notices and, where appropriate, removing the infringing content. However, any removal of content shall not constitute an admission of liability or fault by Backpacker Job Board.

    Login or Register to Apply Online

    Not already a member? Register for free and create your online resume to apply. If you are already registered or have applied for a vacancy before, you can login below.

    Rider Levett Bucknall